模具專業術語中英對照完整指南

本文匯總模具設計與製造領域常用專業術語的中英對照,涵蓋結構設計、材料規範、加工要求、檢驗標準等核心內容,供工程師、技術人員及採購人員參考。

通用規範

  • All in English & Imperial Unit. 全部使用英文和英制單位
  • All replaceable components must be standard components. 所有替換元件必須為標準件
  • BOM including water fittings, ejectors & custom components. BOM內容應包含水路接頭、頂針及自製零件
  • Component and/or 3D mould design drawing. 散件圖或3D模具圖
  • Mouldbase and steel dimensioned. 模座與鋼材型號標注

結構與機構設計

  • Are part dimensions to print plus shrink? 請檢查內模尺寸是否已乘縮水率
  • All wires protected from sharp corners? 凡電線通過處角位須改為R角,是否完成?
  • All moving components should use hardened steel; all slides should be installed with hardened or lubricated alloy wear plates and gibs, and with positive slide retainer. 所有移動零件應用硬鋼;滑塊必須裝硬墊板與硬導軌,並有限位鎖定裝置
  • Core pull slot mechanism installed and O.K. 抽芯機構已安裝且正常
  • Corresponding components mirrored at core & cavity. 對應部件在前後模平面視圖中鏡像
  • Die draw called out. 出模方向標示
  • Dimension all the opening, travel & clearance. 標出前後模距離、滑動部件行程及塑件脫離位置
  • Ejection stroke & slide, lifter travel dimensioned. 頂出行程、滑塊、斜頂行程標注
  • Ejection study if lifter adopted. 採用斜頂時需做頂出分析
  • Guided ejection recommended for mould above 100 tons clamp capacity, ejector pins of 1.5mm or smaller, or ejector stroke longer than 50mm. 鎖模力超100噸、頂針≤1.5mm或頂出行程>50mm時,建議裝頂針板導柱
  • Hydraulic actuated slide together with electrical limit switch. 滑塊採用油壓推動,配合電氣限位開關
  • Jaw angle 3 deg. more than angle pins (<25 degree). 斜面角度比滑塊斜邊大3度(小於25度)
  • Keep enough space to run waterline at slide / lifter / major inserts. 滑塊、斜頂、主要鑲件處預留足夠水路空間
  • Lifter angle less than 15 degree. 斜頂角度小於15度
  • Lifter rods dia, less than 1". 斜頂桿直徑不小於1英寸
  • Minimum 5 deg. for shut-off. 斜頂鑲件最小5度插銷
  • Mechanism for sequence. 動作機構順序是否正確

材料與熱處理

  • BeCu for lifters if w/o water circuits. 無水路時斜頂用鈹銅
  • 4 point in HRC different to lifters contacting or cavity steel. 斜頂與接觸內模/鑲件硬度差4度(HRC)
  • Heaters fitted +0.002/-.000, leads tagged and connected to terminal. 熱嘴裝配公差+0.002/-0.000,電線標識並接線端子固定
  • Inserts keyed and numbered to prevent incorrect assembly. 鑲件定位並編號防錯裝

冷卻與水路

  • Cooling less important when dimensions are not important. 尺寸不關鍵時,適量冷卻即可
  • DME egr. Water fittings recessed and marked? 是否用DME水路接頭並標號?
  • Hot manifold wired to print and checked? 熱流道電線按圖接線並檢查?

加工與檢驗

  • 4X size section, dimensioned to reflect the actual size. 4倍放大剖面圖,按實際尺寸標注
  • Gate & gate ejector pin 4X view, dimensioned to actual size. 水口及水口頂針4倍放大視圖,按實際尺寸標注
  • Check polish for line of draw finish? 是否拋光至出模方向光潔度?
  • Guide pin cleared and vented? 導柱插入模板是否頂著及加排氣?
  • Horn pin clearance hole? 斜邊與滑塊是否有間隙?
  • Limit switch in tact and protected. 限位開關是否已安裝且受保護?
  • Mold safety straps installed and painted red? 安全吊帶是否安裝並噴紅漆?
  • Mould flow and simulation should be carried out for the best gate location, filling analysis, pressure distribution and heat distribution. 應進行模流分析以確定最佳進膠點、流道尺寸、排氣位置等
  • Mould should be designed with maximum cooling and with appropriate amount of ejection points. 設計盡最大冷卻,上下模高溫點單獨冷卻,適量頂針
  • Mould should be able to run fully automatic. Large part should be picked up by robot. 模具全自動運行,大件由機械手取出
  • Mould should be tested to meet a defined Cpk quality standard. 經測試符合預定Cpk質量標準
  • Mould should have safety features to protect accidental damage, incorrect assembly and set up of mould. 具備防誤裝、防損壞安全特性

其他要求

  • Add shot counter? 是否加注塑計數器?
  • Crane capacity and loading clearance. 模具需多大吊車搬運
  • Delivery right side up, or in two halves? 開箱後是否易吊出、是否分前後模運輸?
  • Eyebolt size and balance in 2 sides. 吊環尺寸、平衡,四邊皆需有
  • Eyebolts for inserts more than 50lbs. 重超50磅鑲件必須有吊環
  • General, safety and handling. 常規、安全與搬運要求